Debut delay for new Bay Bridge will allow proper scrutiny of bolt issue

The new eastern span of the Bay Bridge will not open until at least December, as crews work to fashion a fix for broken bolts, but this is a good development. The fix needs to be done right even if it means pushing the opening back past the original Labor Day weekend target date.

So far, just 32 bolts on the new span have been found to be defective. The seismic safety rods were installed to hold in place a piece that allows the bridge to move during an earthquake. But exposure to hydrogen caused the bolts to become brittle and crack while being tightened in March.

Now crews are working toward installing a saddle that will do the same job as the bolts. But the $15 million project will take at least three months to complete.

With critics questioning many aspects of the bridge design, including other bolts used on the span, it is key to work in a swift but cautious manner that allows for maximum transparency for oversight bodies. No one wants the repair to be muddled by questions, as the original bolts were.

But the work should not be slow, either, since drivers crossing the Bay need a safe path — the new span was built because a portion of the existing bridge collapsed in the 1989 Loma Prieta earthquake.

What matters at this point so late in the game is completing the bridge fast enough to get traffic off the old bridge quickly, but not in a rushed manner that could generate further errors.

Bay BridgeBay Bridge bolt problemeditorialsLoma Prieta EarthquakeOpinion

Just Posted

A collaborative workspace for a decentralized autonomous organization (DAO) in Coordinape is pictured at a recent blockchain meet up at Atlas Cafe. <ins>(Kevin N. Hume/The Examiner)</ins>
Business without bosses: San Francisco innovators battle bureaucracy with blockchain

‘The next generation will work for three DAOs at the same time’

Plan Bay Area 2050 is an expansive plan guiding the region’s growth and development over the next three decades. The regional plan addresses progressive policy priorities like a universal basic income and a region-wide rent cap, alongside massive new spending on affordable housing and transportation infrastructure. (Shutterstock)
Plan Bay Area 2050: Analyzing an extensive regional plan that covers the next 30 years

Here are the big ticket proposals in the $1.4 trillion proposal

Pregnant women are in the high-risk category currently prioritized for booster shots in San Francisco. (Unai Huizi/Shutterstock)
What pregnant women need to know about COVID and booster shots

Inoculations for immunosuppressed individuals are recommended in the second trimester

Examiner reporter Ben Schneider drives an Arcimoto Fun Utility Vehicle along Beach Street in Fisherman’s Wharf on Tuesday, Oct. 19, 2021. (Kevin N. Hume/The Examiner)
Could San Francisco’s tiny tourist cruisers become the cars of the future?

‘Fun Utility Vehicles’ have arrived in The City

Most Read