Golden Gate Bridge barrier moving forward

Head-on collisions on the Golden Gate Bridge could be reduced within three years if appproval for a movable median barrier moves forward as planned, a spokeswoman for the bridge district said.

Creation of a 1-foot tall concrete barrier would replace the rubber pylons that are currently used to separate opposing traffic on the bridge. Safety advocates have been pushing for such a device for the last 70 years.

On Thursday, officials from a Golden Gate Bridge Highway and Transportation District subcommittee will vote on approving a contract to carry out the required environmental-impact study on the barrier. On Friday, the vote will go before the full Board of Directors.

It will likely take another month of additional regulation checks with local and state administrators before the study can begin — if  approved — according to bridge district spokeswoman Mary Currie.

The report is scheduled to take 20 months — an extended timeframe due to the bridge being a national landmark. The median barrier, which is designed to be movable to accomodate travel that differs greatly from morning to evening commutes, is expected to be completed by late 2011, Currie said.

Robert Guernsey, who helped found Citizens for a Safe Golden Gate Bridge, said advocacy groups have been pushing the bridge district to add a barrier for seven decades.

“We’re getting closer to our goal, but we really wonder why this wasn’t done years ago,” Guernsey said.

Guernsey’s concerns took on heightened relevance earlier this year when two separate head-on auto collisions left 10 people injured.

On March 26, seven people were hurt in a 10-vehicle crash that stemmed from a head-on collision. On May 21, three people were injured in a head-on collision, although that accident started after one car sideswiped another.

Since 1970, there have been 36 vehicle fatalities on the bridge, with 16 the result of head-on collisions, Currie said. The last fatality was in 2001, and the last from a head-on collision came in 1988, Currie said.

Bridge officials have consistently cited a lack of funding as the main reason for the absence of a moveable barrier.

In February, the district was awarded $20 million in state funds for the $25 million projected cost of the barrier. The remaining funds will come from tolls.

The environmental-impact study will cost roughly $2.8 million, which has already been included in the budget.

wreisman@sfexaminer.com

Bay Area NewsGolden Gate BridgeLocalsafetyTransittransportation

Just Posted

A collaborative workspace for a decentralized autonomous organization (DAO) in Coordinape is pictured at a recent blockchain meet up at Atlas Cafe. <ins>(Kevin N. Hume/The Examiner)</ins>
Business without bosses: San Francisco innovators battle bureaucracy with blockchain

‘The next generation will work for three DAOs at the same time’

Plan Bay Area 2050 is an expansive plan guiding the region’s growth and development over the next three decades. The regional plan addresses progressive policy priorities like a universal basic income and a region-wide rent cap, alongside massive new spending on affordable housing and transportation infrastructure. (Shutterstock)
Plan Bay Area 2050: Analyzing an extensive regional plan that covers the next 30 years

Here are the big ticket proposals in the $1.4 trillion proposal

Pregnant women are in the high-risk category currently prioritized for booster shots in San Francisco. (Unai Huizi/Shutterstock)
What pregnant women need to know about COVID and booster shots

Inoculations for immunosuppressed individuals are recommended in the second trimester

Examiner reporter Ben Schneider drives an Arcimoto Fun Utility Vehicle along Beach Street in Fisherman’s Wharf on Tuesday, Oct. 19, 2021. (Kevin N. Hume/The Examiner)
Could San Francisco’s tiny tourist cruisers become the cars of the future?

‘Fun Utility Vehicles’ have arrived in The City

Most Read