New BART trains should be built by Canadian firm, transit agency recommends 

BART has recommended a Canadian manufacturing firm to head up its $2.5 billion train replacement project despite lobbying by supporters of a firm that would have built more of the cars in the United States.

Scroll down to see video of the BART train announcement.

The regional rail agency operates the oldest fleet of transit trains in the country, and has made replacing the vehicles its top priority. On Monday, BART announced that it will be recommending Bombardier, a firm that has built train systems across the globe, for the project. Bombardier finished with top score from BART’s 31-month bidding process, which weighed eight different criteria and eventually chose between three manufacturing firms.

The agency opted to go with Bombardier despite concerns that the foreign company would not provide as many domestic jobs as its bidding rivals. Bombardier has pledged to build 66 percent of BART’s 775 train cars in the United States, a mark that is above the federal threshold of 60 percent. However, it’s significantly less than the 95 percent promised by Alstom, the French manufacturer that finished second in the contract bidding.

Earlier this month, U.S. Rep. John Garamendi, D-Fairfield, toured the Alstom facility and urged BART to honor its commitment to support domestic growth. The International Association of Machinists and Aerospace Workers also requested that BART take the Alstom contract.

On Thursday, BART’s board of directors will vote on the train replacement contract. The original cost of the plan was projected to be $3.2 billion, but it has since been revised to $2.5 billion.

wreisman@sfexaminer.com


About The Author

Will Reisman

Pin It
Favorite

Comments

Showing 1-1 of 1

Add a comment

 
Subscribe to this thread:
Showing 1-1 of 1

Add a comment

Videos

Related to Transportation

© 2014 The San Francisco Examiner

Website powered by Foundation